Open Access
Article
Publication date: 17 March 2021

Ibrahim Yitmen, Amjad Al-Musaed and Fikri Yücelgazi

Decisions taken during the early design of adaptive façades involving kinetic, active and responsive envelope for complex commercial buildings have a substantial effect on…

2306

Abstract

Purpose

Decisions taken during the early design of adaptive façades involving kinetic, active and responsive envelope for complex commercial buildings have a substantial effect on inclusive building functioning and the comfort level of inhabitants. This study aims to present the application of an analytic network process (ANP) model indicating the order of priority for high performance criteria that must be taken into account in the assessment of the performance of adaptive façade systems for complex commercial buildings.

Design/methodology/approach

The nominal group technique (NGT) stimulating and refining group judgments are used to find and categorize relevant high performance attributes of the adaptive façade systems and their relative pair-wise significance scores. An ANP model is applied to prioritize these high performance objectives and criteria for the adaptive façade systems.

Findings

Embodied energy and CO2 emission, sustainability, energy saving, daylight and operation maintenance were as the most likely and crucial high performance criteria. The criteria and the weights presented in this study could be used as guidelines for evaluating the performance of adaptive façade systems for commercial buildings in planning and design phases.

Practical implications

This research primarily provides the required actions and evaluations for design managers in accomplishing a high performance adaptive façade system, with the support of an ANP method. Before beginning the adaptive façade system of a building design process, the design manager must determine the significance of each of these attributes as high performance primacies will affect the results all through the entire design process.

Originality/value

In this research, a relatively innovative, systematic and practical approach is proposed to sustain the decision-making procedure for evaluation of the high performance criteria of adaptive façade systems in complex commercial buildings.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 November 2020

Seyedhabibollah Sadrinooshabadi, Afshin Taheri, Ibrahim Yitmen and Rogier Jongeling

Each building project demands an integrated method for information and requirement management in its life cycle. The main purpose of this paper is to explore the major obstacles…

Abstract

Purpose

Each building project demands an integrated method for information and requirement management in its life cycle. The main purpose of this paper is to explore the major obstacles in integrated life cycle information management and recognize the potentials of CoClass as the new Swedish digital classification system to tackle them throughout asset life cycle.

Design/methodology/approach

The industry viewpoint toward the current status of asset information management considering ISO 19650-1 principles and the existing obstacles and the industry practitioners' ideas regarding CoClass capabilities and applicability were captured and analyzed. A total of 13 semistructured interviews were conducted with the AECO industry professionals to have an understanding of information requirement management. Then the results were analyzed qualitatively, using the NVivo 12 software. Different attributes of a component (heating panel) in a meeting room according to CoClass and data deviations throughout the asset life cycle were elaborated.

Findings

This study reveals some obstacles in information management process in seven categories in relation to: (1) the need to employ information exchange platforms as common data environments (CDEs) by all actors from early stages; (2) the communication issues caused by lack of utilizing common languages; (3) the costly and time-consuming implementation process; (4) the misunderstandings in terms of data communication between service providers and owners; (5) the definition and fulfillment of information requirements as well as keeping track of data deviations throughout asset life cycle; (6) the information update difficulty; and (7) the need for training practitioners dealing with new systems such as CoClass.

Originality/value

The research explores the major obstacles in information requirement management concerning the practical implementation of the new Swedish classification system, CoClass, supporting the asset life cycle.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 9
Type: Research Article
ISSN: 0969-9988